INDBInternet News Database 2.5 Updated 2 min ago · 393 sources Show or hide images Light or dark

BMC starts demolition of building linked to Dawood Ibrahim in Mumbai

Save Like Comments Compare coverage
Image from The Hindu

Summary

The Bombay High Court has stopped further demolition work at a disputed property linked to fugitive gangster Dawood Ibrahim in Mumbai's Bhendi Bazar. Covered by 3 outlets: 2 lean left, 1 are centre.

Automated summary picked from the outlets' own descriptions.

Who is covering this

  1. Indian Express Leans left Factuality: High IN
    India news Live Updates, 20 November 2026: Gangster linked to Dawood Ibrahim killed in encounter in UP
  2. The Hindu Leans left Factuality: High IN
    BMC starts demolition of building linked to Dawood Ibrahim in Mumbai

    The building was classified as C-1, a category indicating that the structure was dangerous and required demolition

  3. Dnaindia Center Factuality: Mostly factual IN
    Dawood property row: Bombay HC puts brakes on Ibrahim-linked property demolition in Bhendi Bazar

    The Bombay High Court has stopped further demolition work at a disputed property linked to fugitive gangster Dawood Ibrahim in Mumbai's Bhendi Bazar.

Comments

Comments need JavaScript.