INDBInternet News Database 2.5 Updated 2 min ago · 282 sources Show or hide images Light or dark

No complete closure of Ballari Road for 18 months for elevated corridor work: BDA

Save Like Comments Compare coverage
Image from The Hindu

Summary

The clarification comes amid concerns over the traffic disruption expected during the construction period.

Description from The Hindu.

Who is covering this

  1. The Hindu Leans left Factuality: High IN
    No complete closure of Ballari Road for 18 months for elevated corridor work: BDA

    The clarification comes amid concerns over the traffic disruption expected during the construction period.

Comments

Comments need JavaScript.